The Promag D electromagnetic flowmeter adopts a clamping installation method and is suitable for installation in basic applications in the water industry with limited space.
Simple centering installation of sensors: innovative housing structure design
Energy saving flow measurement: no throttling components, no pressure loss
Maintenance free: No movable parts
Optimal handling: Use mobile terminal devices, install SmartBlue app, and operate directly on the touch screen
Simple and efficient debugging: Guided instrument configuration pre setting and on-site setting
Equipped with self verification function: using Heartbeat Technology heartbeat technology
Measurement principle:The Promag D electromagnetic flowmeter adopts a clamping installation method and is suitable for installation in basic applications in the water industry with limited space. The software and hardware design of Promag D 10 is intuitive and clear, greatly simplifying every step of the instrument's entire lifecycle from design to service while ensuring the high quality of Endress+Hauser. Heartbeat Technology ensures the reliability of measurement and compliance of verification.
Product positioning:Clamp on scenarios, water and sewage applications
Usage scenario:The Promag D electromagnetic flowmeter adopts a clamping installation method and is suitable for installation in basic applications in the water industry with limited space. The software and hardware design of Promag D 10 is intuitive and clear, greatly simplifying every step of the instrument's entire lifecycle from design to service while ensuring the high quality of Endress+Hauser. Heartbeat Technology ensures the reliability of measurement and compliance of verification.
Bidirectional flow measurement, completely unaffected by pressure, density, temperature, and viscosity.
Suitable for standard applications in the water industry, it can be installed in narrow spaces and used on plastic pipes.
Contact: Ms. Zeng
Phone: 18186209071
Whatsapp: +86 18186209071
Email: 1347626977@qq.com
Add: 503-4, No.03, Floor 5, Building 2, International Enterprise Center, No.1 Guanshaner Road, Wuhan East Lake New Technology Development Zone
We chat